In I'On, an owner who wants a new exterior paint color files an application, the same as an owner adding a wing. A buyer who plans to change a newly purchased house usually starts by calling a contractor. In I'On the first schedule that matters belongs to the I'On Design Committee, which meets twice a month. Once it approves a project, two deadlines start running, and the committee conducts final inspections.
Article IV of I'On's recorded Declaration generally requires the committee's approval before any improvement or exterior change. The I'On Code, which the committee applies, is written into the Town of Mount Pleasant's I'On Planned Development Ordinance No. 97010. The committee works from the I'On Design Committee Architectural & Landscape Guidelines, Procedures, and Policies, which it approved in 2024. The guidelines say the committee may use aesthetic judgment, so meeting every written standard does not guarantee approval.
Even a Repaint in the Same Color Needs a Signature
Much of I'On's design review is quick, but almost none of it is skipped. Repairs that match the existing material, color and design can usually be approved quickly by the Neighborhood Design Coordinator. That covers like-for-like window replacement, roof replacement, siding repairs, exterior painting and fence repairs. A fast approval is still an approval.
The guidelines also address house numbers, exterior light fixtures, HVAC equipment, temporary storm protection, play equipment and planting in the strip between sidewalk and street.
Changing paint color is the case buyers most often miss. Every new exterior color goes through review. The guidelines use Sherwin-Williams' Historic Colors of Charleston as a starting point and generally discourage choosing the same color as the house next door.
Design Committee Applications
The IDC applications page lists separate forms and checklists, including Maintenance & Repair, Minor Exterior Changes, Landscape Changes and Structural Changes applications.
Rooftop solar is reviewed case by case.
Twice a Month, With a Noon Deadline
The committee meets on the first and third Tuesday of each month unless it posts a different date. A complete hardcopy package has to reach the IDC office at 159 Civitas Street, Suite 212, by noon on the Tuesday before the meeting. A PDF of the full package goes by a single email at the same time. Incomplete applications are not reviewed, and late ones wait for the next agenda.
Under that rule, the next two meetings after this post goes up fall on December 1 and December 15, 2026. Their deadlines are noon on November 24 and noon on December 8. Holiday weeks can change the schedule, so confirm the dates with the IDC office at 843-606-6366 before you plan around them.
For a structural project, the order of steps looks like this:
- Optional conceptual review. This is feedback on structural changes, major landscaping or new construction before full drawings exist.
- Assemble the package. It includes scaled plans from a qualified licensed professional, a current survey, a site plan with existing and proposed lot coverage, and a Town zoning letter confirming the lot type. There are stated exceptions for solar-only and some footprint-neutral proposals.
- Meet with the Neighborhood Design Coordinator. New structures and structural changes need this discussion at least three business days before review.
- Submit by the noon deadline for the meeting you are aiming for.
- Wait for the written decision. The applicant can ask to give a short presentation before the committee deliberates in private. Decisions generally arrive within 30 days of receiving the complete hardcopy and digital package.
Both structural-change applications require a review fee, a completion deposit and a contractor deposit, and both projects need a final inspection. The amounts are printed on each application and can change.
Approval Starts Two Clocks
After written approval, the owner signs a homeowner agreement and gets an IDC approval permit, which has to be posted before work begins. Approved work generally must start within six months and be finished within one year. The six-month limit matters for anyone who gets approval in winter and plans to break ground "after the season."
The guidelines discuss completion deposits, final inspections and deposit refund requests. The first two final inspections are free. A third or later inspection costs at least $150.
If a plan changes in the middle of the project, there is a Changes to Approved Design Application for that purpose.
What Unapproved Work Can Cost
The Declaration gives the I'On Assembly a range of remedies, which are set out in Section 2-105 of the recorded covenants. After notice and a hearing, the Assembly can impose fines that become a lien on the lot. It can require an unapproved improvement to be removed and the lot restored. If the owner does not comply, it can do that work itself and charge the cost to the owner and the lot. It can also bar a noncompliant contractor from working in I'On and sue for damages, recovering its attorney fees if it wins. The Declaration runs with title and binds successors in title.
Committee approval also does not replace the Town. The guidelines say improvements are subject to a Town Single Family Site Improvement Permit, and some projects need building or other permits as well.
The I'On Trust and the Holidays
Section 10-101 of the recorded Declaration sets out a transfer fee for the I'On Trust. The governing documents have been amended over the years, most recently by Amendment #7 in 2025; the current governing documents are the place to confirm the current terms.
Section 10-102 sends that money to a segregated account. Its listed uses include conservation areas, festivals and holiday celebrations, and charitable causes. The Trust's best-known holiday tradition is The Giving Lights of I'On, a luminary-kit fundraiser for a local nonprofit. This year it ends with the Holiday Festival on Sunday, December 6. In one past campaign, Moultrie News reported that residents lit more than 13,000 luminaries and raised more than $54,000 for One80 Place.
Questions Buyers Ask
Who sits on the committee? The Declaration provides for three to five members. The Founder appoints them while it owns unimproved land, and the Assembly Board appoints them after that. Members may be homeowners or professionals. Tourine Johnstone is listed as IDC Coordinator.
Can the committee grant an exception? The guidelines describe a written variance process and discuss property-specific hardship, neighbors and precedent. They strongly encourage sharing a variance request with adjoining owners.
How do I reach the IDC office? Email [email protected] or call 843-606-6366. The IDC contact page lists office hours of Tuesday through Thursday, 9 a.m. to 4 p.m., and Friday, 8 a.m. to noon. The office is closed Mondays.
This post is general information, not legal or financial advice. Before acting, confirm the requirements for your own property with the IDC office, the Town of Mount Pleasant and your attorney.